Ninth Day of West Virginia Service Trip

by Archer Euler ’20 and  Adam Schnitzer ’20

It was the second day on the second site. The crew was split into two separate groups each working on different projects and different parts of the house. One group was with Rick and they were finishing the siding on one side of the house. When we were done with applying the siding, we moved to adding another J channel that way we could apply a roof or barrier from the under side of the roof from the real world. They had holes in it so that way the wood would be able to breath. We had successfully finished J channeling and applying siding to one side of the house. So the new goal is to apply siding and a J channel to the opposite side of the house. This time, we won’t have to rely on ladders because we built scaffolding so that we could have a platform to stand on while we were working. We started working on the second side but it wasn’t exactly as easy as we thought it would be since there were a plenty of spiders and other unwanted bugs. The second group had helped out with the porch out front. They installed girders and cut beams for the foundation. Creating these beams took a couple steps. This included measuring, marking, sawing, and grinding the planks.

Leave a comment

Filed under A Day in the Life, Service, Student Work, Students

Leave a Reply

Fill in your details below or click an icon to log in:

WordPress.com Logo

You are commenting using your WordPress.com account. Log Out /  Change )

Google photo

You are commenting using your Google account. Log Out /  Change )

Twitter picture

You are commenting using your Twitter account. Log Out /  Change )

Facebook photo

You are commenting using your Facebook account. Log Out /  Change )

Connecting to %s